News

Track type throwing machine no-load debugging

Track type throwing pills machine of air turned debugging process
1, and test running Qian must first familiar using manual in the of about provides, on the equipment of structure, and performance do full of understand;
2, and boot Qian must first check the tight firmware whether has loose phenomenon, and the machine of lubrication situation whether is requirements;
3, and the machine requirements Assembly right, boot Qian should the parts, and motor, for single moving test. The motor rotation direction is correct, hoist belt tight is moderate, no deviation phenomenon.
4, should check the motor no-load current, bearing temperature rise, reducer, blast is running properly, found that the problem should be identified in a timely manner, adjust
5 single-action device has no problem, then start filter, lift, throwing the no-load test, no-load operation time of one hour.

 

BACK